Home | Sam's Calendar | Sam's Priorities | Sam's Portfolio | I Want To... | Your Neighborhood | Archives

I-5 Delta Park To Get New Lanes, Interchanges

  • warning: imagejpeg(): Unable to open 'files/images/deltalogo[1].img_assist_custom.jpeg' for writing: Permission denied in /hsphere/local/home/samsadams/commissionersam.com/includes/image.inc on line 300.
  • Unable to create img_assist_custom image

.I-5 traffic is a drag, especially at Delta-Lombard, a major traffic bottleneck that leads to severe congestion, safety and operational problems. The problems on this segment of I-5 also seriously affect regional accessibility and commerce. The need for this project was identified as one of several highway, transit and freight projects recommended by the I-5 Transportation and Trade Partnership, an effort of community leaders and citizens from both states.

This project will provide improvements for I-5 from approximately Victory Boulevard to the Lombard interchange. Phase I will add a new south bound lane (third lane) and widened shoulders in both directions for safety, and reconfigures the Columbia Blvd. interchange. Phase II will add a new north bound access to I-5 from Columbia Blvd.

The project decision process was guided by a Citizen Advisory Committee and an Environmental Justice Work Group. A hearings panel was assembled of ODOT, Vancouver and Portland representatives including Commissioner Sam Adams. A major challenge of the project was to provide freight access to the Columbia Corridor while not impacting neighborhoods, notably Kenton, and other residential areas adjacent to I-5.

Phase II considered four alternatives and "Alternative 2-Argyle on the Hill" was chosen as the Locally Preferred Alternative. This will include a new roadway connection from Columbia Blvd. to a rebuilt Denver Avenue viaduct.

The Federal Highway Administration has greenlighted the project, which will permit it to proceed to construction. Phase I is scheduled to begin construction within the next two years. Phase II's initial design work and right-of-way acquisition is starting, though Sam is still finding funds for construction.

Related Documents

Community Partners


[[ Categories: ]]

Post new comment

The content of this field is kept private and will not be shown publicly.
  • Lines and paragraphs break automatically.
  • Images can be added to this post.
More information about formatting options

Featured videos

Watch it larger here

Watch it larger here

Get Our Updates



Sam's Snapshots

He Served Us Well, Alberta Street Fair, NE PortlandThe Gaze, Lightrail
Power Lunch, SE PortlandIgnoring the Signs Again, Joan Rides Out Ahead, 39th Ave., SE Portland




Syndicate

Syndicate content